USCG Offshore Patrol Cutter

OPC Phase II Detail Design Contract

The Coast Guard awarded detail design for the Offshore Patrol Cutter to Eastern Shipbuilding Group, Inc., on September 15, 2016. Construction is planned to begin in fiscal year 2018. Delivery of the lead OPC is planned for fiscal year 2021.

Hull #300A/B/C: TBD

 

Specifications

Number Planned: 25
Length: 360 Feet
Beam: 54 Feet
Draft: 17 Feet
Sustained Speed: 22 Plus Knots
Range: 8,500 Plus Nautical Miles
Endurance: 60 Days


NYCDOT Staten Island Ollis-Class Ferries

(3) 4500 Double-ended Passenger Ferry

 

Dimensions: 320′-0”x 70′-0”x 21’-6”
ABS A1, Ferry Service, River Service, AMS, USCG
Hull #219: STAFF SGT. MICHAEL OLLIS
Hull #220: SANDY GROUND
Hull #221: TBD

Weeks Marine, Inc.

(1) Twin Screw (8550 yd³) Trailing Suction Hopper Dredger

 

Dimensions: 356’x 79’-6”x 27’-3”
Lloyd’s Register, 100A1 Hopper Dredger, LMC, UMS
Designer: IHC Merwede, BV

Hull #256: M/V MAGDALEN


Great Lakes Dredge & Dock Company, LLC

(1) Dual Mode Articulated Tug/Barge (ATB) Trailing Suction Hopper Dredge

 

 

ABS/USCG/SOLAS/ATB Tug 158’x52’x33′
ABS/USCG/SOLAS ATB Dredge Barge 433’x92’x36′

Hull #252: DOUGLAS B MACKIE (ATB Tug)
Hull #253: ELLIS ISLAND (ATB Dredge Barge)

 

Sailing Schooner

(1) Steel Hull Expedition Sailing Schooner

 

Length On Deck           141’-2”
Length @ Waterline     110’-0”
Hull #134: COLUMBIA II