OPC Hull 2 & LLTM 3rd OPC
April 6, 2020Eastern Shipbuilding Group Announces Construction of the U.S. Coast Guard’s Second Offshore Patrol Cutter (OPC) and Long Lead Time Material for the Third OPC
This entry was posted in The Year in Review. Bookmark the permalink.
Leave a Reply