Eastern Shipbuilding Group, Inc.
  • Home
  • Who We Are
  • What We Do
  • Careers
  • News
  • Contact
  • Employees
  • Suppliers

News

Army Corps shares update on new hopper dredge

PHILADELPHIA —The U.S. Army Corps of Engineers Philadelphia District and Marine Design Center shared an update regarding the ongoing construction of a Medium Class Hopper Dredge (MCHD) to replace the Dredge McFARLAND.

USACE announced the new dredge will be named the DONNELLY after the late Ray Donnelly who retired as Chief of Resource Management for the USACE Philadelphia District in 2020.

In April 2025, construction of the DONNELLY commenced with a steel cutting ceremony at Eastern Shipbuilding Group’s Allanton Shipyard. Since then, modular construction has been progressing steadily, with unit builds underway and fabrication and assembly of various key components. Work is being carried out in close coordination with the USACE Marine Design Center, Eastern Shipbuilding Group, and Royal IHC, the designer of record.

About Ray Donnelly

Ray Donnelly received the de Fleury Medal (Bronze Order) in recognition of his 44-year career in which he served both the U.S. Navy and USACE. He was a key leader in the USACE Resource Management community and conducted a detailed analysis of the four USACE-owned dredges and the impacts of recapitalization on the national Civil Works program. Donnelly was also instrumental in the financial management of the Hopper Dredge McFarland.

About the New Medium Class Hopper Dredge

The new MCHD will play a critical role in enabling the Corps to continue to deliver its navigation mission and provide for safe, reliable, effective, and environmentally sustainable waterborne transportation systems for vital national security, commerce, and recreation needs.  The new dredge is estimated to be placed into service in 2027 and replaces the McFARLAND, one of four oceangoing hopper dredges owned and operated by the Army Corps of Engineers

Vessel Specifications:

  • Length: 320’
  • Beam: 72’
  • Hull Depth: 28’
  • Draft (hopper empty): 11’3”
  • Draft (hopper full): 25’6”
  • Maximum Hopper Capacity: 6000 yd3
  • Maximum dredge depth with suction tube at 45 degrees: 65’

Contact

Steve Rochette
stephen.rochette@usace.army.mil

Release no. 25-010

Read release

Categories:News
Previous PostInterview: Joey D'Isernia, CEO & Chairman, Eastern Shipbuilding Group

Government Services

The U.S. Coast Guard selected Eastern to design and build the Heritage Class Offshore Patrol Cutters. These vessels provide critical border protection and national security capabilities.

 

Learn More

  • Sign up for updates

    Address
    This field is for validation purposes and should be left unchanged.
    • Home
    • Who We Are
    • What We Do
    • Careers
    • News
    • Contact
    • Employees
    • Suppliers
  • Facebook Twitter Linkedin YouTube
  • Locations

    ESG Corporate Office
    1001 E. Hwy 98
    Panama City, FL 32401

    Nelson Street Shipyard
    2200 Nelson Street
    Panama City, FL 32401

    Allanton Shipyard
    13300 Allanton Road
    Panama City, FL 32404

    Port St. Joe Shipyard
    432 Howard Road
    Port St. Joe, FL 32456

    Phone: (850) 763-1900